Geofizyka Torun (GT) is carrying a contract for BARG ARTGEO on the Oder River
GT performs drilling works on the Oder river from a hydraulically stabilized floating platform. Core exploration holes are drilled with natural intact structure sampling in the path of newly designed S6 expressway. The order includes drilling 23 holes with depths ranging from 55.0 m to 71.5 m
in the line of the designed tunnel under the Oder River.

Miniaturka
p7PC2pm9vR0

Other news